Only a few minutes, depending on the job site and on the surrounding obstacles. The average time to unfold the conveyor, place concrete and fold the conveyor, is about 20 mn.
What is the minimum volume that has to be placed ?
What is the maximum volume that can be placed ?
There is no volume restriction; you can even place more than 100 m3 of concrete in one go, or in different job sites the same day.
In practice, for a volume above 40m3, if there is choice between the Concrete Conveyor Belt THEAM and the concrete pump, the last one might be more adapted, especially for large floor slabs or beams.
For how many job sites the conveyor can be used in one day ?
There is no restriction. The conveyor can be used as many times as you wan’t in one day.
The mixer truck can place the concrete 5 or 6 times a day in different places (average frequency) since we need only 7 min to unfold the conveyor, 10 min to place concrete, 10 min to clean the equipment and 5 min to fold the conveyor on mixer truck.
Is the Concrete Conveyor Belt THEAM tropicalized ?
Yes, it is. It works very well under tropics without overheat. A cooling system, running permanently while the PTO is on, keeps the oil under a workable temperature.